Launch Date
Completion Date
RERA ID
26.776203
81.044442
This is a single plot having 1 total no. of entry gate and 1 no. of exit gate from the 18m wide front road and 9m internal road
2 m high and 200 mm thick boundary wall designed. Brick work of 9 inches and RCC work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary
Concerete road with bituminous cover/ high quality concrete pavers will be used as per design as suggested by architect for internal road
As per the requirement
Ground water will be used. End user shall use their individual RO system as per their requirement. Overhead tanks shall be provided for distribution through gravity
Centralized sewerage system shall be provided. All sewerage water shall go to STP for treatment and after treatment, water shall be recycled and it will be used in gardening, overflow from STP shall be connected with Municiple sewerage system.
Storm water system shall be provided. Storm water from roads and other landscape area shall be connected to the storm water drain channel and go to the rain eater harvesting pit for recharging the ground water and overflow shall connect with municiple drain line.
There is four lush green park and green areas along the plot, play area for childrens and different recreational activities
There will be various types of trees provided on site.
We have designed the system as per local electricity board and consider centralized transformer, HT Panel, LT Panel, Feeder pillar and DG back for common service like external lighting, STP, Pump room etc
NA
Centralized sewerage system shall be provided. All sewerage water shall go to STP for treatment and after treatment, water shall be recycled and it will be used in gardening, overflow from STP shall be connected with municiple drain line
There are a proper garbage collection area provided for the solid waste management.
A well designed rain water harvesting system shall be provided for parks to conserve water.
NA
NA
Sewerage, storm water and water supply system shall be provided. We have proposed common pump room with primary filteration, transfer pumps to fill the domestic overhead tank. Water for domestic use and flushing go down through gravity from domestic as well as flushing tanks. All sewerage shall go to STP for recylcing the water. Storm water for roofs, roads and other area shall connect to storm water drain channel and go to the rain water harvesting pit for recharging the ground water and overflow shall connected with municiple drain line.
NA
Luxurious main entrance and convenience store along side of community center for day to day small purchasing, lush green shurbs at every vacant space on ground.
No: Affidavit regarding bookings, sales till date and no project registered on same khasra no. | Date: -
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
94301.30 m²
1015049.76 ft²