Launch Date
Completion Date
RERA ID
29.08121836377058
77.71163162334385
Demarcation of plots already done and the complete detail of plots given in the project specification attached with land details
BOUNDARY WALL all sides 6ft heights, 9 inches width made of bricks
internal roads with soiling coat stone ballast 40-63 mm gauge, inter coat stone ballast 25-55 mm gauage, tack coat on w.b.m surface p/a 5cm thick BM and brick edging on both sides
NOT APPLICABLE
r.c.c overhead tank shaft typr 150 KL capacity over a staging of 16 meter from g.l to top of bottom as per drawing, P.V.C pipe fixing with proper earth work to provide drinking water facilities
SICTC OF 400KLD ANAEROBIC TYPE SEWAGE TREATMENT SYSTEM WITH ALL CIVIL ELECTRICAL AND MECHANICAL COMMISSIONING N.P. R.C.C SPUN PIPE INTO TRENCHES IN DEPTH UPTO 1.20 MTR BELOW GROUND LEVEL TRUE TO SLIGNMENT CAULKING THE JOINTS WITH NECESSARY SPUN YARN
EARTH WORK IN EXCAVATION , CONCRETE WITH 40MM GAUGE B.B FINE SAND AND CEMENT MORTAR IN 12.6.1 AND ALL COMPLETE,1ST CLASS B/W IN CM (1-4) CM
PARKS WILL BE AS PER DEVELPMENT PLAN ATTACHED AND WILL BE COVERED BY BOUNDARY WALL OF 2 FT NHEIGHTS AND WILL HAVE SHADY TREES, GREEN GRASS SITTING BENCHES AND SWINGS FOR CHILDREN
SHADY TREES AT BOTH SIDES OF INTERNALS ROAD AND IN PARKS
500 KW CONNECTION ALREADY APPLIED IRON POLES AT AVERAGE DISTANCE OF 25 TO 30 METER ALUMINIUM WIRING APPROX 35 L.E.D LIGHTS TO COVER 90 PLOTS AND 2 TRNASFORMERS EACH OF 250 KW
NOT APPLICABLE
400 KLD/400 HOUSES SEWEAGE WASTE WATER TREATMENT SYSTEM AS PER LAYOUT AND DRAWINGS
DOOR TO DOOR COLLECTION OF SOLID WASTE AND DUMP BY NAGAR NIGAM
2 RAIN WATER HARVESTING SYSTEMS TO MAINTAIN GROUND WATER LEVEL AND AVOID WATER LOGGING WILL BE GIVEN IN PARK AS PER LAYOUT AND DRAWINGS
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
24718.16 m²
266063.80 ft²