NewActive

Golden Grande "Phase-1"

Gautam Buddha Nagar, Uttar Pradesh
01-01-2022
Launch Date
New
Type
30-12-2025
Completion Date

Overview

Launch Date

01-01-2022

Completion Date

30-12-2025

RERA ID

UPRERAPRJ301910

Basic Details

Project TypeNew
Project CategoryMixed
Total area in round figure (Sq.mt.)51116
Project NameGolden Grande "Phase-1"
Registration Fee (in Rs.)391500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)48
DistrictGautam Buddha Nagar
Original Start Date-
TehsilDadri
Proposed Start Date01-01-2022
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)63161
Proposed Completion Date30-12-2025

Location

Latitude

77.25587

Longitude

28.354863

Bank Details

Account Details
Name of the AccountADVANCE COMPUSOFT RERA TRANSTCTION
Account Number921020026524054
Bank NameAXIS BANK
Branch NameSECTOR 63
Branch AddressSECTOR 63
IFSC CodeUTIB0003873
Branch DistrictGautam Buddha Nagar
Separate Account Details
Name of the AccountADVANCE COMPUSOFT COLLECTION ACCOUNT
Account Number921020026438403
Bank NameAXIS BANK
Branch NameSECTOR 63 NOIDA
Branch AddressSECTOR 63 NOIDA
IFSC CodeUTIB0003873
Branch DistrictGautam Buddha Nagar
Transaction Account Details
Name of the AccountADVANCE COMPUSOFT SEPERATE ACCOUNT
Account Number921020026542434
Bank NameAXIS BANK
Branch NameSECTOR 63 NOIDA
Branch AddressSECTOR 63 NOIDA
IFSC CodeUTIB0003873
Branch DistrictGautam Buddha Nagar

Development Works

Demarcation of Plots

NORTH 7.5 MTRWIDE SERVICE ROAD , SOUTH 60 MTR WIDE ROAD ,WEST PLOY NO.18,EAST 12 MTR WIDE ROAD

Boundary Wall

8FT. HIEGHT WALL FROM INTERNAL ROAD LEVEL & EXTERNAL ROAD LEVEL+1500 MM FROM EXTERNAL ROAD LEVEL

Road Work

VACCUM DEWATERED INTERLOCKING TYLES WITH PAVER

Footpaths

ALL FOOTHPATH WITH INTERLOCKING TYLES/PAVER/COBBLE/GRANITE ETC.

Water Supply Including Drinking Water Facilities

AS PER SPECIFICATION PROVIDED BY CONSALTANT

Sewer System

AS PER SPECIFICATION PROVIDED BY CONSALTANT

Drain

ADEQUATE CATCH BASIN MAINHOLES WITH RAINWATER HARWESRTING PROVIDED IN THE SITE AS PER NOMS

Parks

GREEN ARE PROVIDED AS PER BUILDING BY LAWS

Tree Planting

TREES ARE PER BUILDING BY LAWS

Design For Electric Supply Including Street Lighting

SUFFECIENT LIGHTING PROVIDED AS PER SERVICES DRAWINGS

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

SEWERAGE AND SLUDGE WATER WILL BE TREATED INSIDE STP

Solid Waste Management And Disposal System

NA

Water Conservation System

RAINWATER HARWESTING PROVIDED AS PER NOMS

Energy Management System Including Use of Renewable Energy

PROVIDING AS PER GRIHA NORMS

Fire Protection And Fire Safety System

PROVIDING AS PER FIRE NOMS

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

NA

Other Miscellaneous Work

NA

Documents

Lease Deed

No: 4435 | Date: 29-03-2010

Commencement Certificate

Proforma of Application Form

Proforma of Allotment Letter

Proforma of Completion Certificate(Occupancy)

Development Work Plan

Development Work Plan

Affidavit

Details of Encumbrances

Uploaded: 22-10-2021

Other Plan(If Any)

Uploaded: 06-10-2021

Proforma of Application Form

Uploaded: 13-10-2021

Proforma of Allotment Letter

Uploaded: 13-10-2021

Proforma of Conveyance Deed

Uploaded: 06-10-2021

Waste Disposal Plan

Uploaded: 06-10-2021

Water Supply Plan

Uploaded: 06-10-2021

Electricity Supply Plan

Uploaded: 06-10-2021

Affidavit

Uploaded: 13-10-2021

CA CERTIFICATE

Uploaded: 06-10-2021

ARCHITECT CERTIFICATE

Uploaded: 06-10-2021

ENGINEERS CERTIFICATE

Uploaded: 06-10-2021

Permits

Orignal Permit NoPLG/BPSM-28-MAR-2019/5065
Orignal Permit Date05-10-2021
Valid Upto04-10-2026
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto03-10-2027
End Date31-12-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Gulsahn Dua
Contractor Address804 vashundhra ghaziabad
Architect NameRahul kumar
Architect AddressGaur City 2 Noida
Architect Licence NumberCA/2014/64269
Structural Engineer NameRabi Akthar
Structural Engineer AddressJamia Nagar New Delhi
Mobile number(Project Co-ordinator)9650072125

Land Details

AFS

Showing 7 blocks with 65 units

Property Summary

Total Carpet Area

2560130.98

27556993.86 ft²

Total Units

1850

2 different types

Blocks & Floors

7

24 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:1383.85
Balconies:0
Parking ratio:0.00 per unit

Block G

3 units

Block H

3 units

Block I

3 units

Block IT 1

17 units

Block IT 2

24 units

Block J

2 units

Block RESIDENTIAL BLOCK

13 units

Khasra Details

Total Area

100095.25

1077415.26 ft²

1 plot
Plot
TypePlot
Khasra/Plot No19
Area(In Sq. Mt.)100095.25

Other Details

Contractor Name (if any)Gulsahn Dua
Contractor Address804 vashundhra ghaziabad
Architect NameRahul kumar
Architect AddressGaur City 2 Noida
Architect Licence NumberCA/2014/64269
Structural Engineer NameRabi Akthar
Structural Engineer AddressJamia Nagar New Delhi
Mobile number(Project Co-ordinator)9650072125