85 duplexs will be constructed by developer as per sanction layout plan with best quality material. Along with duplexs development of gardens and other amenities will also be done. Plots and gardens will be demarcated and constructed as per approved sanction layout passed
Boundary wall is under construction . The colony will be fully covered by boundaries wall and will be one gated colony
Bituman based road will be constructed as per approved layout map . Best quality roads will be constructed with use of A grade material
Footpaths Will be constructed as per colony requirements and needs
Water will be supplied through boring and government water supply after taking approvals from statutory departments . Water tank will be constructed to store the water for colony consumption
Centralised sewer system shall be provided . All sewerage water shall go to the township STP for treatment and treated water shall be recycled and it will be used in gardening and overflow from the STP Plant shall be connected with the township sewerage
Storm water system shall be provided . Storm water from roads and other landscapes area shall be connected to storm water drain channel and go to the rain water harvesting PIT for recharge the ground water and overflow shall be connected with towenship drain
Green parks are under construction and will be constructed as per approved layout. The colony will be covered by trees and gardens which will bring better standard of living for the people
Trees will be planted outside every house as well as all over the colony for better standard of living and fresh air
Electricity supply will be designed as per guidelines issued by local electric department .
No community building is proposed for the said project as on the date as per approved layout passed by the competent authority
Centralized sewerage system shall be provided . All sewerage water shall go to the township STP for treatment and treated water shall be recycled and it will be used in gardening and overflow from the STP plant shall be connected with the towenship sewerage
Proper dustbins will be installed at designed layouts for collection of solid waste and disposal as mentioned in approved layout
A well designed water harvesting system will be designed for water conversation
Led lights and other energy saving devises will be installed in external areas. In STP all the equipment shall have energy efficient motors
As per the department of NBFC Norms the house is less than 30 mtrs of height therefore FIR Protection and safety work is not applicable for the said project
Sewerage , Storm water ,and water supply system shall be provided . STP will be installed for reuse of treated water
Not applicable on duple houses
As per approved layout
Total Area
21410.00 m²
230455.10 ft²