Launch Date
Completion Date
RERA ID
26.79591
81.00062
Not Applicable
We will construct 10 Feet Boundary Wall of Bricks.
Not Applicable
Not Applicable
We will have two different borewells. These borewells will supply water through a submersible pump. These pumps shall be 15000 LPH capacity each to supply raw water in underground water tanks.
The sewer system shall consist of soil and wastewater pipelines from the top floor to the basement floor in pre-designed service ducts.
The rain water from roof top shall be routed down pipes passing through each floor shaft till basement floor then finally converging to underground external RWH pipe lines.
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Provisions are provided for recycled water to be used in flushing and irrigation.
This shall be done through Ansal Golf City waste management infrastructure
The Water Conservation system shall be consisting of RWH pits and an associated underground tank of adequate capacity.
Solar energy will be tapped from the terrace floor with an approximate capacity of 100 KW
The system will consist of fire fighting and fire alarm. Firewater Tank in basement and terrace shall be provided for fire fighting.
A dedicated first aid room has been provided to deal with emergency medical services
A fire escape staircase has been provided connecting every floor for emergency evacuation.
Not Applicable
Showing 1 blocks with 13 units
Total Carpet Area
82368.00 m²
886600.92 ft²
Total Units
64
1 different types
Blocks & Floors
1
13 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
12840.00 m²
138208.48 ft²