Launch Date
Completion Date
RERA ID
28.512
77.418
The Project land will be demarcated by its boundry wall to the exact shape and size as per the site plan sanctioned by Noida Authority
2400mm High boundry wall of combination of RCC column/beam with brickwork/ ms work
Road work is proposed with Trimix concreate flooring with P.C.C. base
Footpaths is proposed with combination of kerb stone/pavers on compacted subgrade which will be lasting and visible at all conditions.
the main source of drinking water will be ground water and shall be extracted through tube well and supplied by under ground and overhead water tank.
The soil and waste shall be carried down in separate independently vented pipes . two pipe drainage system shall be adopted as per ASPE standard
separate and independent rainwater drainage system shall be provided for collecting rainwater from terrace , paved area, lawns and roads
the provision of parks in our project will be as per the sanction plan approved by the noida authority
Proposed native adaptive Planting scheme in such a way that the planting design respond to the physiological needs of the place
33 kv incoming supply shall be provided which shall be converted in 415v supply and same shall be feed to the entire system. The time switch operated street lights shall be provide the lux level shall be meet as per NBC-2016 guidelines.
the provision of community buildings is not applicable as per sanctioned plan approved by noida authority
The provision of sewage treatment plant for treatment of sewage and sullage waste. The plant shall comprise of preliminary and secondary (chemical and biological) and tertiary treatment plant.
The provision of solid waste management and disposal system will as per norms applicable
low water flow fixtures are used to conserve the water for the project.
Less or Non-movement area sensor shall be provided . Hybridge solar system shall be provided as renewable energy, it will be synchronising with main supply
As per fire norms provided in NBC-2016 with the fire tender, sprinkler system, smoke detector etc.
The social infrastructure and other Public Amenities including PHS will be provided as per the norms provide by the authority.
Sufficient wide range of staircase as desired with signage planned as per NBC-2016
Not Applicable
Showing 1 blocks with 400 units
Total Carpet Area
25297.05 m²
272294.92 ft²
Total Units
819
2 different types
Blocks & Floors
1
16 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
13812.00 m²
148670.99 ft²