Launch Date
Completion Date
RERA ID
26.936596
80.965298
Plot Demarcation shall be complete by the fixing of RCC pillar on each unit. (450mm height)
Boundary wall of the entire project shall be constructed. 4 feet boundary wall
Semi Dense bituminous concrete (SDBC) roads shall be constructed with the base of GSB WMM. 125 mm GSB, 75mm wmm, 25mm SDBC
Footpaths shall be paving by earthen footpath.
Water supply by underground tank with medium density polyethylene piping system.
RCC hume pipes for Sewerage System.
RCC hume pipes for drainage System.
Green spaces will be developed as per approved layout plan.
Total Number of trees to be planted as per Building by-laws.
Electrical infrastructure will be developed as per approved electrical layout.
Membership of Club Celebrations at ORO City shall be offered on mandatory basis.
MBBR-System S.T.P / or equivalent.
Collection space in STP area. The disposal will be done by Nagar Nigam vendor.
Rain Water Harvesting system will be developed.
Solar water heating/ Solar energy system to be decided later on the basis of feasibility study.
It is a plotted development Project. Therefore, fire safety/protection system not required.
NA
Safe evacuation Plan of the occupants is important for high-rise building whereas this is a plotted development
NA
Total Area
6.44 m²
69.30 ft²