demarcation of plots will be exceuted from 01-11-2024 and will be completed with in 6 month
boundary wall sides 6 th height 9 inch width made brikcs and intermediate RCC colums shall be provided from 01-11-2024 and completed upto 11-01-2027
internal road with soiling coat stone ballast 40-63 mm gauge inter coat stone ballast 25-55 mm gauage tack coat on w.b.m. surface p/a 5mm thick BM and brick edging on both side shall be provided from 01-11-2024 and will be completed upto 11-01-2027
NA
under ground pipe lines PVC pipe fixing with proper earthwork to provide drinking water facilities and will be connect to water tank of earl project GH- I as already mention in secntion letter
r.c.c. spun pipe into trenches in depth upto 1.20mtr below ground level will be connected to stp of earlier project gh-i
EARTH WORK IN EXCAVATION CONCRETE WITH 40MM GAUGE B.B FINE SAND AND CEMENT MORTAR IN 12.6.1 AND ALL COMPLETE 1ST CLASS B/W IN CM (1-4)CM
PARKS COVERS BY BUNDARY WALL OF 2FT HEIGHT AND WILL HAVE SHADY TREES GREEN GRASS SITTING TREES BENCHES AND SWINGS FOR CHILDREN
SHADY TREES AT BOTH SIDES IF THE INTERNALS ROAD AND IN PARKS
500 KW CONNECTION ALREADY APPLIED IRON POLES AT AVERAGE DISTANCE OF 25 TO 30 METER ALUMINIUM WIRING APPROX 30 LED LIGHTS TO COVER 90 PLOTS AND 2 TRNASFORMERS EACH OF 250 KW
n/a
no saprate stp will be provide however all the sewrage line will be connected to stp of the project GH-I
door to door collection of solid waste and dump by nagar nigam shall be done
2 RAIN WATER HARVESTING SYSTEM TO MAINTAIN GROUND WATER LEVEL AND AVOID WATER LOGGING
N/A
N/A
N/A
N/A
N/A
Showing 1 blocks with 5 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
15831.30 m²
170406.53 ft²