Launch Date
Completion Date
RERA ID
26.579053
80.24146
We have 286 plots of different sizes having 1 main entrance gate from the 60 m road on which the project is situated
2 m high and 140 mm thick Brick work and rcc work in column and beam is proposed in the project
From the main entrance gate we have connected 20-40 feet pathways to each existing plot.
We have provided 5 ft. footpath in parks of Kota stone in the project.
We will provide Two nos. of bore well for the requirement through underground pipelines in the project.
Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be used in car washing , gardening and irrigation.
Storm water from Roads and other landscape area shall be connected to the drain pipes and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be excreted outside the premises.
We will provide green area with the different activities and the green area will have sports facilities for kids in our project
We will provide many type of trees along the boundary wall & green area in our project
We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service in project.
NA
Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be reused for gardening, utility like car wash and irrigation ,when come into force.
There are a proper garbage collection area provided for the solid waste management.
We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
We will use LED lights fitting in external area and we will suggest to individual also to use.
We will follow the local authorities requirements in our project
NA
NA
NA
Total Area
55.00 m²
592.01 ft²