Demarcation of Plots will be done in accordance with the Approved Layout Plan using demarcating stones
300 Rmt of Wall with MS Railing - RCC Columns at regular intervals with plinth Beams, Bands and MS Railings 330 Rmt of Wall with Solid Masonry - In-fill walls are of Brick Masonry with Cement Mortar Wall Surfaces are plastered on both side and finished with Cement based paints 3 Number of MS Gates - Enclave is a gated community and can be approached from 3 entries of 9M Wide
4365 Sq. Mt. of Road Surface - All units are approachable by 9.00 M and 7.50M wide Roads with a carriage way of 4.90M minimum Roads made up of 200mm thick GSB and 150mm thick WMM as sub base and the finishes are with 60mm thick M-35 Grade Pavers duly supported on a 50mm thick Sand Cushion over 75mm thick of DLC
2560 Sq. Mt. of Footpath Areas - Footpaths are made up of 60mm thick approved Pavers duly supported on a 50mm thick Sand Cushion over 150 mm thick Brick Bat.
1160 Rmt of Water Supply - Separate Network for water supply and irrigation laid within the Enclave using HDPE Pipes of adequate sizes 400 Rmt of Irrigation - Connections are being taken from Township Service mains
990 Rmt - Network comprising of Brick Masonry Manholes/Chambers inter-connected with DWC Pipes and culminated with Truck Sewer of the Township
STORM WATER (External Drainage) 840 Rmt - Network comprising of Brick Masonry Manholes/Chambers inter-connected with DWC Pipes and culminated with Trunk Line of the Township. INTERNAL DRAINAGE 715 Rmt - Network comprising of Brick Masonry Manholes/Chambers inter-connected with DWC Pipes and culminated with Truck Line of the Township
0.647 Acres - Parks with play areas are being developed. Parks with jogging/walking tracks, play area for children, outdoor gym, sitting plazas and lawns will be constructed in the Project.
TREES Around 120 Nos - Trees along the sides of Roads at regular intervals are provided
COMPACT SUB STATION 2 Nos CSS; 300 Mt HT Cables - CSS comprising of HT Compartment, Transformers and LT Compartment for Distribution of Electricity CABLES and FEDER PILLARS 11 Nos of Feeder Pillars; 2500 Rmt of various cables - Distribution cables are laid for different zones within the enclave and controlled with Feeder Pillars 1150 Rmt of HDPE Conduits - Cables from Feeder Pillar to Plots are being laid through HDPE Conduits of suitable diameter LV Systems 1800 Rmt of HDPE Conduits - Provisions are made with HDPE Conduits of suitable diameter to run the LV Cables whenever required STREET LIGHTS 39 Poles with sensor based Luminiare -Adequate street lights are provided along the roads LV Syste
Community Buildings are Not Applicable for this present project.
The network of the development will be linked to the trunk network of Sushant Golf City for this Zone.
The House-to-House waste collection in Sushant Golf City is being done by the Promoter of this Hi-Tech City and same will be done by him for this proposed development as this development is an integral part of the Hi-Tech City
Rainwater Harvesting pits are proposed to be developed in the Project
The present project being a Plotted Development Solar Bollards etc will be installed in the Green Areas.
Not Applicable in the present Project as the same is a Plotted Development.
The present Project is an integral part of Sushant Golf City and all such facilities for the population of this development at township level by the Promoter of Sushant Golf City.
Not Applicable in the present Project as the same is a Plotted Development, however, green areas are provided with lawns etc where residents can assemble in the event of any emergency.
Not Applicable
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
26146.00 m²
281432.93 ft²