Demarcation of plots would be done through stone blocks in front brick work at baack
Boundary of 10 feet height with M-25 RCC column beam frames structure at 4 mtr interval.
There are roads of 12 mtr 18 mtr width. With 9 mtr 10 mtr metal portions the various section are as follows- 1. soil subgrade 150 mm 2. layer stone 93-60 mm ( 100 mm ) 3 rd layer 25-50 mm stone 4th layer wearing corse M-25 trimix concrete height 100 mm.
Compacted soil with selection 1 grass kerbstones.
M-25 fully reinforced RCC underground water tank connected with UPVC pipes network with each plot.
Sewer system consist of double layer HDPE pipes with manholes at regular interval ending up in fully functional sewage plant of 75 KLD as per central ground water control pollution norms.
Drain consist of double layer HDPE pipes of suitable sections with standard slops manholes at regular interval.
Park consist of beautiful landscape along with 1000 of plants, shrubs trees it also has 150 feet length cascade water body kids play area, pathways, tennis court, basketball court, open amphitheatre
yes
Electric Supply as per hydle norms proper load has been sanctioned by the electrical department supported with underground network of cable laying properly design MCCBs control panel. Street light consist of 6 mtr LED light with iron base.
6500 sqft cvered area split into yoga meditation centre laisure lobby fully equpit GYM, pantry with indoor activites.;
STP system with 75 KLD with central ground water pollution norms.
STP ( 75 KLD ) horticulture waste management of the green area functional at site.
Rain water harvesting pits as per development authority norms. has been built
NA
NA
NA
NA
NA
Showing 1 blocks with 1 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
55257.00 m²
594780.82 ft²