Launch Date
Completion Date
RERA ID
26.704668
83.408078
Demarcation of the plot has already been done
The boundary walls of 6 feet to 7 feet will be provided as per the site requirement. The wall will be a brick wall with a width of 4 inches.
Bituminous and concrete roads will be provided as per the requirement of the site. the width of the road is variable as per the condition with the depth of the top layer of 25mm in bituminous and 150 mm top in case of concrete pavement
A suitable pathway designed for roads built with RCC paver blocks will be provided. The strength of the paver block will be M-10
UP Jal Nigam / Borewell water for drinking and domestic use with the distribution network of pipelines spread across the project will be laid.
A centralized sewer system shall be provided. The sewer water will be sent to STP with the suitable diameter of pipe line.
Rain water harvesting and flood water drains are provided.
Provision of several parkas / Green belts in front and all round of apartment towers as per arch design.
Provision of complete tree plantation and green belts designed by landscape architects.
Provision of centrilised electrical supply system to apartments / amenities / lifts / water pump rooms / stp etc. As per norms and specifications / requirements of pvvnl uppcl.
The community building is already under construction having all the common facilities for the residents of the project.
Provision of centrilised sewerage system going to STP for treatment and after treatment water shall be recycled for flushing and horticulture works.
Proper garbage collection area is designated to be disposed as per town area system
A complete system of rain water harvesting through long open water bodies / or rain water recharge pits is designed by consultants as per requirement.
We will use LED leight fittings as ell as solar lights in external areas and common areas in stp/pump rooms / lifts energy efficient motors / equipments will be used.
A proper fire protection and safety system designed as per norms and requirements.
For domestic water supply a ugr shall be provided withe primary filtration and treatment. After treatment water shall be transferred to over head tanks for supply to apartments. all sewerage / waste water will be treated in stp and after treatment shall be cirrculated for flushing through overhear flusing water tanks and for horticulture works. all rain water from terraces and ground surfaces will be harveshted through infiltration / recharging in the ground water.
NA
NA
Showing 2 blocks with 94 units
Total Carpet Area
13576.04 m²
146131.14 ft²
Total Units
88
3 different types
Blocks & Floors
2
14 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
6387.00 m²
68749.03 ft²