Launch Date
Completion Date
RERA ID
26.737588
83.378299
DONE
1.8 - 2.1 M HEIGHT BOUNDARY WALL DESIGNED,
BITUMENOUS/ TRIMIX CONCRETE ROADS AS PER DESIGN BY ARCHITECTS.
SUITABLE PATHWAY DESIGNED FOR ROADS IN CONCRETE/ PAVERS/ TILES / EQUIVALENT FINISHES
UP JAL NIGAM/ BOREWELL WATER FOR DRINKING AND DOMESTIC USE
CENTRALIZED SEWER SYSTEM SHALL BE PROVIDED
CENTRALISED DRAINAGE SYSTEM SHALL BE PROVIDED
PROVISION OF SEVERAL PARKS/ GREEN BELTS IN FRONT AND ALLROUND OF APARTMENT TOWERS AS PER ARCH. DESIGN
PROVISION OF COMPLETE TREE PLANTATION AND GREEN BELTS DESIGNED BY LANDSCAPE ARCHITECTS
PROVISION OF CENTRILISED ELECTRICAL SUPPLY SYSTEM TO APARTMENTS/ AMENITIES/ LIFTS/ WATER PUMP ROOMS/ STP ETC. AS PER NORMS & SPECIFICATIONS/ REQUIREMENTS OFPVVNL, U.P.P.C.L.
NA
PROPER GARBAGE COLLECTION AREA IS DESIGNATED TO BE DISPOSED of AS PER TOWN AREA SYSTEM
A COMPLETE SYSTEM OF RAINWATER HARVESTING THROUGH LONG OPEN WATERBODIES/ OR RAIN WATER RECHARGE PITS IS DESIGNED BY CONSULTANTS AS PER REQUIREMENTS
WE WILL USE LED LIGHT FITTINGS AS WELL AS SOLAR LIGHTS IN EXTERNAL AREAS AND COMMON AREAS. IN STP/ PUMP ROOMS/ LIFTS ENERGY EFFICIENT MOTORS/ EQUIPMENTS WILL BE USED
A PROPER FIRE PROTECTION AND SAFETY SYSTEM DESIGNED AS PER NORMS AND REQUIREMENTS
FOR DOMESTIC WATER SUPPLY A UGR SHALL BE PROVIDED WITH PRIMARY FILTRATION AND TREATMENT. AFTER TREATMENT WATER SHALL BE TRANSFERRED TO OVERHEAD TANKS FOR SUPPLY TO APARTMENTS. ALL SEWERAGE/ WASTEWATER WILL BE TREATED IN STP AND AFTER TREATMENT SHALL BE CIRCULATED FOR FLUSHING THROUGH OVERHEAR FLUSHING WATER TANKS AND FOR HORTICULTURE WORKS. ALL RAINWATER FROM TERRACES AND GROUND SURFACES WILL BE HARVESTED THROUGH INFILTRATION / RECHARGING IN THE GROUNDWATER.
NA
NA
Showing 1 blocks with 5 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
105108.00 m²
1131372.00 ft²