Covered boundary wall.
RCC wall/column and brick work as per drawings.
Cement Concrete Internal Road ( CC Road above the 2 course of WBM)
Interlocking pavers and stones as per drawings.
Water Storage will be done in under ground water tank.
Main sewer line has been designed as per norms and partially lay in basement ceiling and will finally connect to STP.
Underground pipe drain with chamber.
Landscape and tree planting has been designed by as per the authority guidelines.
Landscape and tree planting has been designed by as per the authority guidelines.
Designed has been done as per UP electricity board guidelines.
Community facilities area has been designed as per authority norms and facilities.
sewer will be treat for recycling (if required) otherwise it will connected to the sewer line of authority which is already connected to central functional STP of GDA for this locality.
Door to Door collection and will be disposed up to garbage point of authority.
Recycling of treated water and rain water system to be provide.
solar panel has been provided as per norms and suitable place.
System will be provide as per the fire department guidelines.
As per sanction plan.
As per the sanction plan for the fire department.
NA
Showing 3 blocks with 128 units
Total Carpet Area
30611.09 m²
329494.71 ft²
Total Units
142
3 different types
Blocks & Floors
3
28 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
37500.00 m²
403646.25 ft²