demarcation of the plot will be done by the engineer and proper demarcations will be done of blocks by making brick pillers
boundary wall of 8 feet height will be done with rcc piller in it at 15 feet distance
rcc road will be constructed which will having 8 inch thickness and having steel meshong in it
interlock tiles of 35 mm will be used with pcc floor
5 lac liter water tank will be constructe and the water line will be laid down
sewer line of rcc pipes will be laid down and STP will be constructed
rain water harvesting tank will be main .the overall rain water will be come in these tanks by pipe lines
arboricuture and beautification of parks will be done
tree will be plant by 125 trees per hectare
electric pole,wire,transformer will be installed shortly
NA
NA
NA
NA
NA
NA
NA
NA
NA
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
39810.00 m²
428510.86 ft²