DEMARCATION OF PLOTS WILL BE DONE AS PER THE SANCTIONED MAP WITH PROPER SET BACK.
BOUNDRY WALL AT SITE WILL BE MADE OF FLY ASH / CLAY BRICKS WITH COLUMN AND BEAM STRUCTURE. THE HEIGHT OF THE BOUNDRY WALL BE FT. PLASTER WILL BE DONE ON BOTH SIDE OF THE BOUNDRY WALL AFTER THAT TWO COAT OF PAINTSWILL BE COATED.
CONCRETE / APEX ROADS WILL BE MADE AT SITE. THE BASE OF THE ROAD WILL BE FILL RED MORUM. AFTER THAT TWO LAYERS OF AGGREGATEMM WILL BE LAID TO MAKE SURE THAT THE ROAD IS UPTO THE MARK, AFTER THIS THE TOP LAYER WILL BE COLOURED AND BLACK AND WHITE APEX . ROAD WILL BE 9MTR. TO 12 MTR WIDE .
FOOTHPATHS WILL BE MADE BY INTERLOCKING TYPE B CONCRETE BLOCK PAVERS WITH A MINIMUM PATH WIDTH 1.5 MTR AND THICKNESS OF 80MM.
FOR WATER SUPPLY WE HAVE A PROVISION OF BORING WATER. WATER SUPPLY PROVISION WILL BE PROVIDED VIA SYSTEM OF PUMPS AND PIPES. WATER WILL GET STORED IN UNDERGROUND TANKS AND FROM THERE WATER WILL GET SUPPLIED TO INDIVIDUAL UNITS PERSONAL TANKS . THIS WATER WILL BE USED FOR DRINKING AND DAILY USE PURPOSE.
SEWAGE TREATMENT PLANT WILL BE CONSTRUCTED AT SITE , ALL WATER DRAINS AND WASTE DRAIN WILL COME AND CONNECT IN THIS SEWAGE TREATMENT PLANT. THIS STP WILL FILTER THE WATER AND THAT WILL BE USED FOR PLANTATION .
DRAIN WILL BE MADE BELOW THE FOOTPATHS WITH CHAMBERS AT 10 MTR. DISTANCE. DRAINS WILL BE MADE WITH BRICKS WORK AND PVC PIPES OF DIFFERENT DIA. THE WATER FROM DUPLEX WILL COME THROUGH PVC PIPES IN THIS DRAINS AND A PROPER SLOPE WILL BE MAINTAINED TILL STP PLANT . THE WATR WIL GET COLLECTED THROUGH DRAINS IN STP PLANT .
PARKS ARE PROVIDED IN THE COLONY. THESE PARKS CAN BE USED AS CHILDRENS PLAY AREA, JOGGING, SIT OUT SPACE ETC.
WE WILL PLANT 400 TREES ALL OVER THE CAMPUS AND IN THE GARDEN AS WELL
IRON POLES WITH STREET LIGHTS WILL BE PLACED ALL OVER THE CAMPUS AND PROPER ELECTRIFICATION WITH TRANSFORMERS AND WIRES WILL BE DONE AS SHOWN IN THE LAYOUT . ELECTRIFICATION WILL BE DONE IN ALL DUPLEXES ALSO WITH ISI MARK WIRES, MODULAR SWITCHES WITH PROPER EARTHING ARRANGEMENTS .
NOT APPLICABLE
TREATMENT AND DISPOSAL SYSTEM OF SEWAGE AND SULLAGE WATER WILL BE PROVIDED BY CONSTRUCTING STP PLANT. IN THIS ALL WATER COLLECTED FROM DIFFERENT SOURCES (KITCHEN WATER , BATHROOM WATER, USED FOR WASHING CLOTHS ETC) WILL BE COLLECTED AT ONE PLACE AND RECYCLE THE SAME AND WILL BE USED FOR OTHER WORKS LIKE GARDENING, WASHING THE COMMON AREAS ETC.
NOT APPLICABLE
WATER CONSERVATION SYSTEM WILL BE PROVIDED ON SITE IN THIS WE WILL MAKE BORE IN DIFFERENT POINTS IN THE GARDENS AS WELL AS IN THE COMMON AREAS . IN THIS WE STORE RAIN WATER BELOW THE LAND AND STOCK THAT WATER TO FLUSH OUT FROM DRAINS AT THE TIME OF RAINY SEASONS.
NOT APPLICABLE
NOT APPLICABLE
PROVIDING TODDLERS PARK, CHILDRENS PLAY STATION , SITOUT AREAS , LUSH GREEN GARDENS
NOT APPLICABLE
NOT APPLICABLE
Showing 1 blocks with 1 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
33995.59 m²
365925.13 ft²