Rectangular Plot having 7382.93 sqm area. Front side of plot is 48.06m, which is accessible from 18m wide road. Other sides are 101.60m and 111.90m and rear side is 99.70m
260 mm thick and 2.6 m heigh boundary wall having boxing design and lelves play with the design.
cement concrete is proposed for road work of project
N.A.
We have Installed Tank for One day Storage and Overhead tank for Half day storage. Water requirement & Occupant load shall be as per NBC. All the storagewater from common Pumps shalle be pump out to the ovehead tank and from tank wagter shall com down the units Via Gravity. Pump Room shall have primary filter by ACF, MGF and end user shall be used their individual RO system as per their requirement.
Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatment after treatment ,water shall be recycle and it will use in gardening and overflow from the STP shall be connect with the Municiple sewarage system.
Storm water shall be Provided. Storm water from Roof,Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municple drain line.
Total 1000 sqm area provide for the green/park area. Main central park is the biggest patch of green and other one are surrounfding the building. There are some beautiful truf and pavers also proposed and rest of the area indian grass are provided."
"There are 4 type of trees proposed in site are,Neem, Jarul, Kachnar and crimson temple tree.
We have design the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel and DG back for common service like Lift,External lighting,STP,Pump room,Fire fighting system etc.
N.A.
Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and flushing system and oveflow from the STP shall be connect with the Municiple sewarage system.
For solid waste garbage collection area provided in site
We will use low flow fixtures as well dual flush cistern and rain water harvesting system to reduce the water consumption and improve the ground water level.
We will use LED lights fitting in all area as well solar lights for external lighting .In STP and Pump room all the equipment shall have energy efficient motor.
Fire Hydrant internal and External,HoseReel,Fire Extinguiser, Sprinkler System(Where as Applicable as per NBC-2016),Provided at each floor.Under ground fire Tank,Overhead fire Tank,Fire Pumps e.g Electrical as well Diesel, Manual Alarm with fire alarm control panel, Smoke evacution scheme in Basemens and Pressurization for Lift well,Lift lobby,Staircase.
"Sewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room with Primary filteration, Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewgage shall be go to the STP for recycling the water. Storm water for Roof,Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municple drain."
4 number of fire staircases have been provided for emergency evacuation
N.A.
Showing 1 blocks with 32 units
Total Carpet Area
16389.50 m²
176414.94 ft²
Total Units
334
3 different types
Blocks & Floors
1
16 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
7382.93 m²
79469.12 ft²