28.436149
77.547173
Demarcation of Plot has been done by UPSIDC. Plot No. S - 9, as shown in the demarcation map of UPSIDC.
60 cm height brick masionary boundary wall and 75 cm of grill on top of the masionary wall.
Road with interlocked tiles
N/A
Water supply from the borewell within the premises and storage of water in overhead tank
UPVC connecting pipe to septic tank in the premises
UPVC drains for storm water
One Common Green Lawn can be provided
Trees as per approval drawings has been provided
Electric substation shall be provided as per the MEP design and street lighting shall be powered by supply from the substation
N/A
Sewage pipeline from the project shall discharge into the USIDC sewage system
Solid waste disposal system shall be provided as approved plans
Rain water harvesting system shall be implemented
High Voltage supply received from the grid shall be converted to LT supply and shall be used for all the purposes of supply
Sprinkler system, smoke detector and fire alarm system shall be provided as per approved maps.
N/A
N/A
N/A
Showing 1 blocks with 47 units
Total Carpet Area
1656.68 m²
17832.34 ft²
Total Units
96
2 different types
Blocks & Floors
1
3 floors across all blocks
Parking
0
0 garages, 0 open