OngoingActive

Gaur Mulberry Mansions - FH-03

Gautam Buddha Nagar, Uttar Pradesh
01-11-2013
Launch Date
Ongoing
Type
01-11-2022
Completion Date

Overview

Launch Date

01-11-2013

Completion Date

01-11-2022

RERA ID

UPRERAPRJ4897

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)566103
Project NameGaur Mulberry Mansions - FH-03
Registration Fee (in Rs.)2836000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)109
DistrictGautam Buddha Nagar
Original Start Date01-11-2013
TehsilGautam Buddha Nagar
Proposed Start Date01-11-2013
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)40500
Proposed Completion Date01-11-2022

Location

Latitude

28.556593868186155

Longitude

77.4346749939164

Bank Details

Account no.26490350000019
Name Of Account HolderGaursons Hi-Tech Infrastructure Private Limited
Bank NameHDFC Bank Limited
Branch AddressHDFC BANK LTD., SG 18,19,20,21 STELLAR IT PARK, SECTOR-62, NOIDA UTTAR PRADESH 201306
Branch NameSEC-62, NOIDA
IFSC CodeHDFC0002649

Development Works

Demarcation of Plots

Designated plots is demarcated as per the Lease plan issued by the authority

Boundary Wall

Boundary wall has already been constructed on site

Road Work

Internal roads designed of different R.O.W. as per requirement

Footpaths

Footpaths is provided as per the Layout plan

Water Supply Including Drinking Water Facilities

Municipal water supply is used for drinking purpose.

Sewer System

Sewerage system is used with STP as per the design calculation

Drain

Separate drainage line is used as per the design requirement

Parks

Landscape area is provided as per Local Building Bye-laws

Tree Planting

No. of trees as per the approved drawings & equirements.

Design For Electric Supply Including Street Lighting

Electric supply including street lighting is provided as per the Layout plan.

Community Buildings

Designed for community facilities as per the design requirement

Treatment and Disposal System of Sewage and Sullage water

Disposal system of Sewage and Sullage water is being used through STP which is used for Landscape and flushing purpose.

Solid Waste Management And Disposal System

All the solid waste managed as per the biogradible waste converted in to compost and non biogradible delivered to registered recyclable agencies.

Water Conservation System

Low flow water fixtures being used for water conservation and STP water is used for landscape and flushing purpose.

Energy Management System Including Use of Renewable Energy

Specific U-value glass is used for energy management and for roof insullation light colour tiles is used, and for renewable energy Solar photovoltic energy is used for Common areas.

Fire Protection And Fire Safety System

Fire system and fire safety systems installed in the buildings as per the NBC norms.

Social Infrastructure And Other Public Amenities Including Public Health Services

Social infrastructure and other public amenities including public health services are provided as per local Building Bye-laws

Emergency Evacuation Services

As per Environment management plan and Disaster management plan all provisions are made including assembly point

Other Miscellaneous Work

Other Miscellaneous work is provided as per the Layout Plan

Documents

Registry Document

No: 21328 | Date: 03-11-2012

Lease Deed

No: 21328 | Date: 03-01-2012

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 03-09-2019

Commencement Certificate

Uploaded: 29-07-2018

Proforma of Application Form

Uploaded: 29-07-2018

Proforma of Allotment Letter

Uploaded: 29-07-2018

Proforma of Conveyance Deed

Uploaded: 29-07-2018

Waste Disposal Plan

Uploaded: 29-07-2018

Water Supply Plan

Uploaded: 29-07-2018

Electricity Supply Plan

Uploaded: 29-07-2018

Development Work Plan

Uploaded: 29-07-2018

Affidavit

Uploaded: 29-07-2018

CA CERTIFICATE

Uploaded: 20-11-2020

ARCHITECT CERTIFICATE

Uploaded: 20-11-2020

ENGINEERS CERTIFICATE

Uploaded: 20-11-2020

Other Plan(If Any)

Uploaded: 29-11-2017

Other Plan(If Any)

Uploaded: 29-11-2017

Other Plan(If Any)

Uploaded: 15-12-2017

Other Plan(If Any)

Uploaded: 19-12-2017

Other Plan(If Any)

Uploaded: 05-01-2018

Other Plan(If Any)

Uploaded: 05-01-2018

Other Plan(If Any)

Uploaded: 06-01-2018

Other Plan(If Any)

Uploaded: 08-01-2018

Other Plan(If Any)

Uploaded: 12-04-2018

Permits

Orignal Permit NoPLG(BP)/3065/2253
Orignal Permit Date04-05-2017
Valid Upto03-05-2022
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto02-05-2027
End Date02-05-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)M/S P.F Construction
Contractor AddressIslam Nagar near Moti Masjid, Sir syed Nagar, Moradabad
Architect NameAteesh Agarwal
Architect AddressF-89, Green Park, New Delhi-16
Architect Licence NumberCA/2003/31212
Structural Engineer NameN.A
Structural Engineer AddressN.A
Mobile number(Project Co-ordinator)01204343333

Land Details

Plot

Showing 1 blocks with 1 units

Property Summary

Total Carpet Area

0.00

0.00 ft²

Total Units

0

1 different types

Blocks & Floors

1

1 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:NaN
Balconies:0
Parking ratio:NaN per unit

Block undefined

1 units

Khasra Details

Total Area

561727.95

6046383.48 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoPlot no. FH-03, SECTOR Agricultural Greens
Area(In Sq. Mt.)561727.95

Other Details

Contractor Name (if any)M/S P.F Construction
Contractor AddressIslam Nagar near Moti Masjid, Sir syed Nagar, Moradabad
Architect NameAteesh Agarwal
Architect AddressF-89, Green Park, New Delhi-16
Architect Licence NumberCA/2003/31212
Structural Engineer NameN.A
Structural Engineer AddressN.A
Mobile number(Project Co-ordinator)01204343333