OngoingActive

Fusion Homes

Gautam Buddha Nagar, Uttar Pradesh
01-08-2013
Launch Date
Ongoing
Type
29-06-2021
Completion Date

Overview

Launch Date

01-08-2013

Completion Date

29-06-2021

RERA ID

UPRERAPRJ3302

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)36000
Project NameFusion Homes
Registration Fee (in Rs.)185000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)95
DistrictGautam Buddha Nagar
Original Start Date14-03-2011
TehsilGautam Buddha Nagar
Proposed Start Date01-08-2013
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)54700
Proposed Completion Date29-06-2021

Location

Latitude

28.599454469752434

Longitude

77.44498816489218

Bank Details

Account no.16688640000019
Name Of Account HolderFusion Buildtech Pvt Ltd
Bank NameHDFC Bank Ltd
Branch AddressA-38, Anand Vihar Delhi-110092
Branch NameAnand Vihar
IFSC CodeHDFC0001668

Development Works

Demarcation of Plots

The plot is demarcated as per GNIDA original map

Boundary Wall

The Plot is marked by Boundary Wall on all three sided

Road Work

Three Gates have been planned for Project connecting it to access roads. Project is bounded by roads on three sides

Footpaths

Separate Jogging Track available

Water Supply Including Drinking Water Facilities

Drinking water shall be provided by GNIDA and system established at Project consists of 500 KL storage in Underground tanks. Besides Underground tank, each Tower has been serviced with separate Overhead Tanks for Drinking water and Recycled water

Sewer System

Sewer Treatment plant Capacity 750 KLD is being established along with Separate Pump House.

Drain

The STP is further connected into main drain

Parks

Central Park in 1.5 acre has been provided. 12520 soft green area provided

Tree Planting

256 Evergreen and ornamental trees provided

Design For Electric Supply Including Street Lighting

Electric sub-station consist of 33KV Meter room, 33KV HT panels ( one incomer-3 outgoing), 3 Transformer and DG sets. 1 kVA DG back-up shall be provided to each apartment besides essential services subjected to Diversity factor. Expansion arrangement is being planned for 4 DG sets be it space for DG installation or necessary modifications in Electrical Panel

Community Buildings

Club is complete with following facilities a) Kids Pool and Swimming Pool. b) Gymnasium c) Spa ( Steam and Sauna) d) Banquet e) Billiards Room/Card Room f) Library g) Creche h) TV Room i) TT Room j) Squash Court k) Locker Room l) Guest Rooms ( 4 Nos)

Treatment and Disposal System of Sewage and Sullage water

Sewer Treatment plant Capacity 750 KLD is being established along with Separate Pump House.

Solid Waste Management And Disposal System

Sewer Treatment plant Capacity 750 KLD is being established along with Separate Pump House

Water Conservation System

Rain water Pits are provide for collection of rain water

Energy Management System Including Use of Renewable Energy

Solar Panels are used for common ligtening

Fire Protection And Fire Safety System

Fire Fighting network is being established consisting of Fire fighting tank ( Capacity 200 KL ), Pump House, Fire escapes in each Tower, Fire Hydrant, Yard Hydrants and Fire sprinklers in each dwelling areas to tackle Fire hazards

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

The emergency doors and staircase and fire shafts are provided

Other Miscellaneous Work

Water Fountains and Shops are also provided

Documents

Allotment Letter issued by Competent Authority

No: Builders/2010/BRS-79/83 | Date: 12-10-2010

Lease Deed

No: I-22962/10 | Date: 02-11-2010

Allotment Letter issued by Competent Authority

No: Builders/2010/BRS-79/83 | Date: 12-10-2010

Details of Encumbrances

Uploaded: 09-08-2021

Commencement Certificate

Uploaded: 30-07-2018

Proforma of Application Form

Uploaded: 30-07-2018

Proforma of Conveyance Deed

Uploaded: 30-07-2018

Proforma of Completion Certificate(Occupancy)

Uploaded: 21-08-2021

Water Supply Plan

Uploaded: 30-07-2018

Development Work Plan

Uploaded: 30-07-2018

Affidavit

Uploaded: 30-07-2018

CA CERTIFICATE

Uploaded: 02-08-2018

ARCHITECT CERTIFICATE

Uploaded: 30-07-2018

ENGINEERS CERTIFICATE

Uploaded: 21-08-2018

Authentic copy of Approval of Project

Uploaded: 21-02-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 21-02-2018

Registry Document In Case of Own Land

Uploaded: 21-02-2018

Proforma of Application Form

Uploaded: 21-02-2018

Development Work Plan

Uploaded: 21-02-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 21-02-2018

Commencement Certificate

Uploaded: 21-02-2018

Permits

Orignal Permit NoPLG/BP/2521/1908
Orignal Permit Date28-04-2017
Valid Upto28-04-2022
Revalidated Permit NoPLG/BP/2521/1908
Revalidated Permit Date28-04-2017
Revalidated Permit Valid Upto28-04-2022
Permit Extendable Upto31-12-2020
End Date31-12-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Kamal & Associates Pvt Ltd
Contractor AddressPlot No.1, LSC Market, 3rd Floor, Mayur Vihar-2, Delhi-110091
Architect NameDeepak Mehta & Associates
Architect Address16, Abhishek Plaza, LSC Market, Mayur Vihar-2, Delhi-110091
Architect Licence NumberCOA/87/10840
Structural Engineer NameKeen Designers Pvt Ltd
Structural Engineer AddressH-53, First Floor, Sector-63, Noida-201301
Mobile number(Project Co-ordinator)8527561116

Land Details

AFS

Showing 13 blocks with 751 units

Property Summary

Total Carpet Area

109663.21 m²

1180403.83 ft²

Total Units

1604

5 different types

Blocks & Floors

13

20 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:68.37 m²
Balconies:2712
Parking ratio:0.00 per unit

Block A

59 units

Block B

39 units

Block C

59 units

Block D

95 units

Block E

61 units

Block F

22 units

Block Fusion Bazaar

30 units

Block G

61 units

Block H

95 units

Block I

59 units

Block J

41 units

Block K

96 units

Block L

34 units

Khasra Details

Total Area

36000.00 m²

387500.40 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-05A, Techzone-4, Greater Noida West
Area(In Sq. Mt.)36000

Other Details

Contractor Name (if any)Kamal & Associates Pvt Ltd
Contractor AddressPlot No.1, LSC Market, 3rd Floor, Mayur Vihar-2, Delhi-110091
Architect NameDeepak Mehta & Associates
Architect Address16, Abhishek Plaza, LSC Market, Mayur Vihar-2, Delhi-110091
Architect Licence NumberCOA/87/10840
Structural Engineer NameKeen Designers Pvt Ltd
Structural Engineer AddressH-53, First Floor, Sector-63, Noida-201301
Mobile number(Project Co-ordinator)8527561116