Launch Date
Completion Date
RERA ID
26.85178
80.93905
N/A
Boundary Wall shall be constructed on all the three sides in first class brick work with 1;6 cement sand mortar proportion. 230 mm x 230 mm R.C.C. Column shall be provided at regular intervals with expansion joints where required. On road side M.S. Railing shall be provided up to the height of 2.1 meters with 6 meter wide gate as per site plan
80mm Paver stones over 100mm PCC over 50mm Sand bed
N/A
Terrace Tank of 25000 litres capacity shall be provided for water supply. All the toilets and kitchens will be connected from terrace tank through different sizes of PVC pipes. Water shall be available round the clock in the building.
Waste water of the building shall be discharged through pvc pipe of 150 mm diameter laid in trenches of 230mm wide covered with course aggregate. The trenches shall be excavated to a slight gradient (1 in 300 or so). Inspection chamber shall be provided at regular interval
The rainwater from roof top shall be routed through down pipes passing through each floor shaft till ground floor then finally converging to under ground external RWH pipelines. These underground RWH pipelines shall finally transfer rain water harvesting pits (1 Nos.) provided at site. The surface rain water shall be collected through drain from roads and all other surfaces in open/under ground trenches. The trenches shall be covered with MS gratings through out on top of open trenches. PVC pipe of 150mm diameter shall be laid in trenches of 230mm wide covered with course aggregate.
535.64 sq mtr area has been proposed
19 no of Trees are proposed to be planted
The electrical supply shall be drawn from MVVNL electrical infrastructure of high voltage line. This high voltage supply shall be tapped from MVVNL source to our high voltage controlling unit consisting of VCB, step down transformer, LT power control systems and LT power shall be then distributed through power cables to energy supply meters of Individual consumers and shall be individually billed for recording power consumptions by MVVNL. The necessary features shall be like earthing and other protection shall follow as per standard applicable norms The street light designing shall be separately done as per land scaping and road design plans. All lighting system electricity supply shall be compatible with necessary earthing as per Bureau of Indian Standards, MVVNL Rules and regulations
N/A
A septic tank of 20000 liters capacity shall be provided
Different types of bins shall be kept in the building to collect waste of the building and disposed by the municipality vans of Lucknow Municipal Corporation
Water Conservation System shall consist of RWH (Rain Water Harvesting) pits and associated under ground tank of adequate capacity
Solar Energy shall be tapped from terrace floor with required capacity. The total energy produced throughout the day time from solar panels will be directed to online grid systems of MVVNL for maximum benefit
All rules and regulations of NBC shall be followed The system will consist of fire fighting equipment, firehose reels, extinguishers, underground water tank, Terrace and Jockey pumps etc. Necessary fire water tank on terrace shall be provided, fire sprinklers as required on both commercial floors as per NBC guidelines. Basement shall be provided with sprinklers and fire fighting systems as per NBC guidelines
N/A
Fire Escape
N/A
Showing 1 blocks with 6 units
Total Carpet Area
4328.12 m²
46587.45 ft²
Total Units
6
2 different types
Blocks & Floors
1
6 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3666.00 m²
39460.46 ft²