OngoingActive

Cleo County ,Phase -3,(Comprising towers E1,E2,E3,

Gautam Buddha Nagar, Uttar Pradesh
05-08-2016
Launch Date
Ongoing
Type
27-02-2023
Completion Date

Overview

Launch Date

05-08-2016

Completion Date

27-02-2023

RERA ID

UPRERAPRJ2437

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)26396
Project NameCleo County ,Phase -3,(Comprising towers E1,E2,E3,
Registration Fee (in Rs.)137000
AddressNOIDA
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)79
DistrictGautam Buddha Nagar
Original Start Date05-08-2016
TehsilGautam Buddha Nagar
Proposed Start Date05-08-2016
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)45398
Proposed Completion Date27-02-2023

Location

Latitude

28.598451

Longitude

77.391327

Bank Details

Account Details
Name of the AccountIV COUNTY PVT. LTD. COLLECTION A/C
Account Number2012184914
Bank NameKOTAK MAHINDRA BANK
Branch NameSECTOR-63, NOIDA
Branch AddressH 1a/15, SECTOR 63, NOIDA, 20301, UTTAR PRADESH
IFSC CodeKKBK0000180
Branch DistrictGautam Buddha Nagar
Transaction Account Details
Name of the AccountIV COUNTY PVT. LTD.
Account Number9111966212
Bank NameKOTAK MAHINDRA BANK
Branch NameSECTOR-63, NOIDA
Branch AddressH 1a/15, SECTOR 63, NOIDA, 201301, UTTAR PRADESH
IFSC CodeKKBK0000180
Branch DistrictGautam Buddha Nagar

Development Works

Demarcation of Plots

Total Plot Area- 99820sqm (Area to be developed in this phase-26396sqm) N-30m Wide Road and 30m wide green belt, S- Towers of other phases and Green area, E- 30m Green belt and 30m wide Road , W- 72m wide Green belt and 70m wide road

Boundary Wall

Yes, Masonary Pucca and Railing Boundary wall

Road Work

Yes, RCC Trimix Road with Kerb stone on sides .Stone Paving infront of Towers.

Footpaths

Yes, Cement Concrete , stone and Grass Pavers

Water Supply Including Drinking Water Facilities

Yes, Noida Authority water supply system collected in Under Ground Water reservoirs at two locations . Terrace Tanks, filled with Hydro Pneumatic pumps.

Sewer System

Yes, RCC hume pipe with Manhole ,Chambers and Collection chamber and connections with Authority sewer System.

Drain

Yes, saucer drain and RCC hume pipe system

Parks

Yes, Beautiful landscape with civil work with masonary and stone, horticulture work and various types of plantation, shrubs.

Tree Planting

Yes, Tree planting all along road in the project.

Community Buildings

Yes, With banquet, Gym, Indoor games facilities all weather pool and swimming pool common for all phases

Treatment and Disposal System of Sewage and Sullage water

Yes, S.T.P and through Authority IS Sewer Line and Drain in south side of project (common for all phases)

Solid Waste Management And Disposal System

Yes, Organic Waste convertor, collection Bins and segregation table.

Water Conservation System

Yes, Rain water Harvesting Pits and dual Plumbing system . Drip Irrigation with sprinkelrs

Fire Protection And Fire Safety System

Diesel Pump - 1 No, Electrical Pump for Hydrant - 1No ,Electrical Pump for Sprinkler - 1 No,Jockey Pumps - 2 Nos , Water Curtain Pumps -1 No,Basement internal & external hydrants sprinklers.

Social Infrastructure And Other Public Amenities Including Public Health Services

Yes, Proper Water supply and sanitary facilities provisions

Emergency Evacuation Services

Yes

Other Miscellaneous Work

Yes, Guard Room, Entrance and exit gates maintenance room, commercial facilities.

Documents

Lease Deed

No: 1/4834/251-268/3072 | Date: 03-11-2015

Other

Other

Details of Encumbrances

Uploaded: 02-09-2021

Commencement Certificate

Uploaded: 05-07-2018

Other Plan(If Any)

Uploaded: 14-06-2019

Proforma of Application Form

Uploaded: 29-01-2019

Proforma of Allotment Letter

Uploaded: 04-07-2018

Proforma of Conveyance Deed

Uploaded: 04-07-2018

Proforma of Completion Certificate(Occupancy)

Uploaded: 29-06-2020

Waste Disposal Plan

Uploaded: 05-07-2018

Water Supply Plan

Uploaded: 05-07-2018

Electricity Supply Plan

Uploaded: 04-07-2018

Development Work Plan

Uploaded: 18-01-2019

Affidavit

Uploaded: 17-05-2018

CA CERTIFICATE

Uploaded: 29-02-2020

ARCHITECT CERTIFICATE

Uploaded: 29-02-2020

ENGINEERS CERTIFICATE

Uploaded: 29-02-2020

Authentic copy of Approval of Project

Uploaded: 27-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 27-04-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-04-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-04-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-04-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-04-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-04-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-04-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-04-2018

Commencement Certificate

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Registry Document In Case of Own Land

Uploaded: 30-04-2018

Proforma of Allotment Letter

Uploaded: 06-05-2018

Proforma of Conveyance Deed

Uploaded: 06-05-2018

Waste Disposal Plan

Uploaded: 06-05-2018

Water Supply Plan

Uploaded: 06-05-2018

Electricity Supply Plan

Uploaded: 06-05-2018

Permits

Orignal Permit NoNOIDA/MVN/2016/III-289/923
Orignal Permit Date05-08-2016
Valid Upto04-08-2021
Revalidated Permit NoNOIDA/MVN/2018/III-289/1042
Revalidated Permit Date03-07-2018
Revalidated Permit Valid Upto02-07-2023
Permit Extendable Upto02-07-2023
End Date31-08-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoNOIDA/MVN/2016/III-289/923
Orignal Permit Date05-08-2016
Valid Upto04-08-2021
Revalidated Permit NoNOIDA/MVN/2016/III-289/923
Revalidated Permit Date05-08-2016
Revalidated Permit Valid Upto02-07-2023
Permit Extendable Upto02-07-2023
End Date31-08-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoNOIDA/MVN/2016/III-289/923
Orignal Permit Date05-08-2016
Valid Upto04-08-2021
Revalidated Permit NoNOIDA/MVN/2016/III-289/923
Revalidated Permit Date05-08-2016
Revalidated Permit Valid Upto02-07-2023
Permit Extendable Upto02-07-2023
End Date31-08-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)SUPERSONIC TECHNOBUILD PVT LTD
Contractor Address423,KOHAT ENCLAVE,PRITAMPURA, NEW DELHI
Architect NameMR VISHAL SHARMA
Architect AddressC/O CONFLUENCE COUNSULTANCY SERVICE , B-421, NEW FRIEDNS COLONY,NEW DELHI
Architect Licence NumberCA/98/23261
Structural Engineer NameM/S VINTECH CONSULTANTS
Structural Engineer AddressC-35,PAMPOSH ENCLAVE,GK-1,NEW DELHI
Mobile number(Project Co-ordinator)9899270803

Land Details

AFS

Showing 5 blocks with 125 units

Property Summary

Total Carpet Area

67042.18 m²

721635.32 ft²

Total Units

449

4 different types

Blocks & Floors

5

30 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:149.31 m²
Balconies:308
Parking ratio:0.00 per unit

Block E3

31 units

Block F1

29 units

Block F2

29 units

Block G

31 units

Block Nursery School

5 units

Khasra Details

Total Area

99820.00 m²

1074452.50 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-05, Sector-121
Area(In Sq. Mt.)99820

Other Details

Contractor Name (if any)SUPERSONIC TECHNOBUILD PVT LTD
Contractor Address423,KOHAT ENCLAVE,PRITAMPURA, NEW DELHI
Architect NameMR VISHAL SHARMA
Architect AddressC/O CONFLUENCE COUNSULTANCY SERVICE , B-421, NEW FRIEDNS COLONY,NEW DELHI
Architect Licence NumberCA/98/23261
Structural Engineer NameM/S VINTECH CONSULTANTS
Structural Engineer AddressC-35,PAMPOSH ENCLAVE,GK-1,NEW DELHI
Mobile number(Project Co-ordinator)9899270803
Cleo County ,Phase -3,(Comprising towers E1,E2,E3, by IV COUNTY PVT LTD | ReraTracker