Launch Date
Completion Date
RERA ID
28.64465
77.48805
With CC element & marked with paint
Combination of RCC column/beam with brick work
Subgrade with 1 layer GSB/2 layer of WMM & black top
Combination of Kerb stone/pavers on compacted subgrade
GI water supply feeded from over head water tank
RCC hume pipe with manhole as per design
RCC hume pipe with manhole as per design/Saucer drain
Provided different types of tree like Ashoka/bamboo/ficus benziminna/timber tree etc.
As per UPPCL/PVVNL norms
Community Buildings is a common facility for all phases of the project and the same is available in phase 1 of the project.
STP provided
System as per requirement planned
Rain harvesting system provided
NA
As per fire norms provided
As per requirement planned
Staircase as desired with signage planned
NA
Showing 4 blocks with 199 units
Total Carpet Area
23426.97 m²
252165.56 ft²
Total Units
427
4 different types
Blocks & Floors
4
20 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
53000.00 m²
570486.70 ft²
Processing Time
235 days
From application to approval
01-01-2024
23-08-2024