NewActive

Centre Point Complex

Lucknow, Uttar Pradesh
01-06-2022
Launch Date
New
Type
30-12-2024
Completion Date

Overview

Launch Date

01-06-2022

Completion Date

30-12-2024

RERA ID

UPRERAPRJ398937

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)1802
Project NameCentre Point Complex
Registration Fee (in Rs.)15800
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)31
DistrictLucknow
Original Start Date-
TehsilSarojini Nagar
Proposed Start Date01-06-2022
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)500
Proposed Completion Date30-12-2024

Location

Latitude

26.81104

Longitude

81.00742

Bank Details

Account Details
Name of the AccountSkylandvision Collection Account for Centre Point Complex
Account Number0328010100002019
Bank NameJammu and Kashmir Bank
Branch NameAkbari Gate Crossing
Branch AddressAbdulaziz Road, Akbari Gate Crossing
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeJAKA0LUKNOW
Separate Account Details
Name of the AccountSkylandvision Seperate Account for Centre Point Complex
Account Number0328010100002020
Bank NameJammu and Kashmir Bank
Branch NameAkbari Gate Crossing
Branch AddressAbdulaziz road, Akbari Gate Crossing
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeJAKA0LUKNOW
Transaction Account Details
Name of the AccountSkylandvision RERA Transaction Account for Centre Point Complex
Account Number0328010100002021
Bank NameJammu and Kashmir Bank
Branch NameAkbari Gate Crossing
Branch AddressAbdulaziz road, Akbari Gate Crossing
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeJAKA0LUKNOW

Development Works

Demarcation of Plots

Demarcation of plot GGCP-COM-M2-B-situated at EMAAR MGF integrated township already done before starting of project.

Boundary Wall

Boundry wall work already done. Northern wall is 48.55 mt, Eastern is 15.19 mt, Western is 21.90 mt and southern is 58.38 mt. Size of the wall is 5.6 ft (height) and width is 9 inch. Remaining work will be done before completion.

Road Work

Since the project is at the corner their is no need to develop road at site, however, wears n tears (if any) will be done after completion.

Footpaths

Project is at T-End of the road i.e, at the corner. No specific footpath required to be done. Building foothpath will be done before completion..

Water Supply Including Drinking Water Facilities

Water supply available from "Jal Kal" department and also we will install tank of 25K Gallon at the roof top as back-up.

Sewer System

Sewer system already available by Lucknow Muncipality Corporation - LMC.

Drain

Water drain system will be developed as water supply and drain plan.

Parks

Since it is single commercial building supposed to be developed their is no park development required.

Tree Planting

Since it is single commercial building supposed to be developed their is no specific "Tree Planting" required. We will work on tree planting near parking and indoors.

Design For Electric Supply Including Street Lighting

We plan to have proper lightning inside building as per electrical plan. Also, we will arrange power back-up 24X7 as back-up. Additionally, we will work with relevant government departments to maintain existing street lights.

Community Buildings

Project is commercial in nature their is no requirement of community building.

Treatment and Disposal System of Sewage and Sullage water

We plan to have robustic treatment and disposal system of sewage and sullage water as per plan.

Solid Waste Management And Disposal System

We will develop solid waste management and disposal system as per attached plan.

Water Conservation System

We are working with our engineers and see how well we can conserve water.

Energy Management System Including Use of Renewable Energy

No applicable.

Fire Protection And Fire Safety System

We will install "Fire protection and fire safety system" as per standard norms by the fire department during the development of project.

Social Infrastructure And Other Public Amenities Including Public Health Services

Since our project is commercial in nature their is no need for amenities. We will keep all hygiene and human health safety protocols up and running. after completion.

Emergency Evacuation Services

Emergency evacuation plan prepared and we will make sure that in case of emergencies fire alarm and clear staircase remain available. We will work with stakeholders on tenant training on evacuation.

Other Miscellaneous Work

Work-In-Process.

Documents

Registry Document

No: IN-UP21630040140578U | Date: 11-02-2022

Allotment Letter issued by Competent Authority

No: 389/EE/HTIG/2016 | Date: 29-11-2016

Commencement Certificate

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Affidavit

Other

Details of Encumbrances

Uploaded: 23-05-2022

Other Plan(If Any)

Uploaded: 07-07-2022

Proforma of Application Form

Uploaded: 23-05-2022

Proforma of Allotment Letter

Uploaded: 23-05-2022

Proforma of Conveyance Deed

Uploaded: 23-05-2022

Waste Disposal Plan

Uploaded: 27-06-2022

Water Supply Plan

Uploaded: 25-05-2022

Electricity Supply Plan

Uploaded: 25-05-2022

Development Work Plan

Uploaded: 25-05-2022

Affidavit

Uploaded: 29-06-2022

CA CERTIFICATE

Uploaded: 23-05-2022

ARCHITECT CERTIFICATE

Uploaded: 25-05-2022

ENGINEERS CERTIFICATE

Uploaded: 23-05-2022

Other

Uploaded: 22-07-2022

Permits

Orignal Permit NoCommercial building/04427/LDA/BP/21-22/2862/3032022
Orignal Permit Date19-05-2022
Valid Upto18-05-2027
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto18-05-2028
End Date31-12-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Skylandvision Infra Private Limited
Contractor AddressA-1, Grandeur Apartments 3, 93 Dalibagh Lucknow 226001 - UP
Architect NameRavi Kant Dubey
Architect Address521K/93 Bara Chand Ganj Chappartala, Mahanagar, Lucknow
Architect Licence NumberCA/2019/116144
Structural Engineer NameChaudhary Mohammed Nadeem
Structural Engineer AddressAlima Cottage Sector 16 house 1265, Indira Nagar Lucknow
Mobile number(Project Co-ordinator)9335907523

Land Details

AFS

Showing 1 blocks with 5 units

Property Summary

Total Carpet Area

8031.00

86444.88 ft²

Total Units

17

2 different types

Blocks & Floors

1

5 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:472.41
Balconies:0
Parking ratio:0.00 per unit

Block Centre Point Complex

5 units

Khasra Details

Total Area

1801.97

19396.22 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGGCP-COM-M2-B
Area(In Sq. Mt.)1801.97

Other Details

Contractor Name (if any)Skylandvision Infra Private Limited
Contractor AddressA-1, Grandeur Apartments 3, 93 Dalibagh Lucknow 226001 - UP
Architect NameRavi Kant Dubey
Architect Address521K/93 Bara Chand Ganj Chappartala, Mahanagar, Lucknow
Architect Licence NumberCA/2019/116144
Structural Engineer NameChaudhary Mohammed Nadeem
Structural Engineer AddressAlima Cottage Sector 16 house 1265, Indira Nagar Lucknow
Mobile number(Project Co-ordinator)9335907523