Launch Date
Completion Date
RERA ID
28.843545
78.769735
Demarcation is done with boundary walls.
Proposal for boundary wall around the project of four side up to 12 ft.heights
Provision for 6.0 m wide drive way as per approved drgs
Proposal for footpath area as per approved drgs
Provision for water supply by over head tanks for drinking and fire water tanks in each Tower/block seperately
Provision for sewer line and manholes connecting to STP OF 400 KLD as per approved drgs
Provision for internal drains for rain water and external water collection for harvesting of water
Proposal for green and landscape area as per approved drgs
Proposal for 136 nos of trees plantation as per approved drgs
Provision of Led street lighting , dedicated transformer,including power backup as per approvals
Provision for Club for social gathering and public meeting.
Provision of 65 KLD STP plant dedicated to project
Door to door garbage collection will be disposed upto point of Authority.
Rain water harvesting system at ground level around the projects.
N/A
Provision of Sprinkler and Hydrant systems for each Block/Tower including external area
Provision for club and external space for public amenities
Provision for fire stairs for Emergency Evacuation Services in each Tower /block separately.
Amphitheatre ,Swimming pool ,Green area
Showing 3 blocks with 77 units
Total Carpet Area
10312.56 m²
111003.36 ft²
Total Units
88
2 different types
Blocks & Floors
3
11 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1419.57 m²
15280.11 ft²