Launch Date
Completion Date
RERA ID
25.3855512
82.9028726
Plot Demarcated through boundaries as per VDA (Varanasi Development Authority)
Boundary wall of the project has been done through concreate pillars and 9" brick work approx. 1.8m metre height.
Road work will be done through PCC and concreate around the building as per VDA sanctioned MAP.
Not Applicable
Water supply including drinking water facilities will be provided through bore well and water tank on roof top of the building.
Sewer system will be provided around the building and will connect pipe line in STP.
Separate pipe line will be provided from roof top to surface and surface drain along with boundaries.
Not Applicable
Trees will be planted at site as per VDA instruction.
Electric supply through separate transformer.
Not Applicable
STP will be Installed at project to treatment of sewage water.
Not Applicable
Rain water harvesting work will be done as per VDA Norms.
Solar Panel will be installed at roof top for renewable Energy.
work will be done for fire protection and fire safety system As per fire department guidelines (Provided at the time of NOC).
Not Applicable
For emergency evacuation two extra stairs will be provided as per sanctioned map
Not Applicable
Showing 1 blocks with 142 units
Total Carpet Area
13703.81 m²
147506.44 ft²
Total Units
142
3 different types
Blocks & Floors
1
11 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
6529.21 m²
70279.76 ft²