OngoingActive

ANIKA VIHAR

Lucknow, Uttar Pradesh
01-03-2017
Launch Date
Ongoing
Type
22-09-2018
Completion Date

Overview

Launch Date

01-03-2017

Completion Date

22-09-2018

RERA ID

UPRERAPRJ8523

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)1348
Project NameANIKA VIHAR
Registration Fee (in Rs.)12000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)19
DistrictLucknow
Original Start Date01-03-2017
TehsilLucknow
Proposed Start Date01-03-2017
Sanctioning Competent AuthorityU.P. Awas Evam Vikas Parishad
Project Cost (in Lacs)280
Proposed Completion Date22-09-2018

Location

Latitude

26.83

Longitude

81.02

Bank Details

Account no.001863700001372
Name Of Account HolderANEE RAJAWAT INFRA PRIVATE LIMITED
Bank NameYES BANK
Branch AddressTULSI COMPLEX, 12, RANI LAXMIBAI MARG, HAZRATGANJ, LUCKNOW
Branch NameHAZRATGANJ
IFSC CodeYESB0000018

Development Works

Demarcation of Plots

IT IS ROW HOUSES, DEMARCATION IS PROVIDED AS PER THE SANCTIONED PLAN.

Boundary Wall

no boundary wall.

Road Work

Road is developed by the company, builder and linked to the main road.

Footpaths

there is no footpaths there because of no main road it is.

Water Supply Including Drinking Water Facilities

submersible is provided.

Sewer System

separate for each houses.

Drain

connected to main sever line , of jila panchayat sewer line.

Parks

it is not a simple project so it is not required park. however jila panchayat providing it nearby places.

Tree Planting

outside the boundary walls by the builder.

Design For Electric Supply Including Street Lighting

street light is being provided by the local authority.

Community Buildings

no need of it.

Treatment and Disposal System of Sewage and Sullage water

it is on the jila panchayat.

Water Conservation System

we are made necessary system in each house and educated the inhabitant for this.

Energy Management System Including Use of Renewable Energy

as per the local laws.

Fire Protection And Fire Safety System

educated inhabitant to maintain this.

Social Infrastructure And Other Public Amenities Including Public Health Services

all public health services are nearby of the project.

Emergency Evacuation Services

no need of it.

Other Miscellaneous Work

we are working on it all the time.

Documents

Registry Document

No: IN-UP0932506354900O | Date: 26-04-2016

Registry Document

No: 6465 | Date: 26-04-2016

Details of Encumbrances

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Commencement Certificate

Uploaded: 28-07-2018

Proforma of Application Form

Uploaded: 28-07-2018

Proforma of Allotment Letter

Uploaded: 28-07-2018

Proforma of Conveyance Deed

Uploaded: 28-07-2018

Waste Disposal Plan

Uploaded: 28-07-2018

Water Supply Plan

Uploaded: 28-07-2018

Electricity Supply Plan

Uploaded: 28-07-2018

Development Work Plan

Uploaded: 28-07-2018

Affidavit

Uploaded: 28-07-2018

Permits

Orignal Permit No1159
Orignal Permit Date22-09-2017
Valid Upto22-09-2018
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto22-09-2018
End Date27-07-2018
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No1159
Orignal Permit Date22-09-2017
Valid Upto22-09-2018
Revalidated Permit No1159
Revalidated Permit Date22-09-2017
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto22-09-2018
End Date27-07-2018
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No1159
Orignal Permit Date22-09-2017
Valid Upto22-09-2018
Revalidated Permit No1159
Revalidated Permit Date22-09-2017
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto22-09-2018
End Date22-09-2018
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No1159
Orignal Permit Date22-09-2016
Valid Upto22-09-2018
Revalidated Permit No1159
Revalidated Permit Date22-09-2016
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto22-09-2018
End Date22-09-2018
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Vijay prasad
Contractor Address13a, Vnayak Ciy, santpuram,Takrohi, Indiranagar, lucknow
Architect Namesadique ahien
Architect Address5/4, vipul khand, gomti nagar lucknow
Architect Licence NumberCA/2013/80957
Structural Engineer NameVinay rajbhar
Structural Engineer AddressGauri Bazar Sarojini Ngar, Lucknow
Mobile number(Project Co-ordinator)8303223232

Khasra Details

Total Area

2695.17

29010.50 ft²

2 plots
Khasra
TypeKhasra
Khasra/Plot NoPlot part of Khasra No. - 19
Area(In Sq. Mt.)1347.583
Plot
TypePlot
Khasra/Plot No19
Area(In Sq. Mt.)1347.583

Other Details

Contractor Name (if any)Vijay prasad
Contractor Address13a, Vnayak Ciy, santpuram,Takrohi, Indiranagar, lucknow
Architect Namesadique ahien
Architect Address5/4, vipul khand, gomti nagar lucknow
Architect Licence NumberCA/2013/80957
Structural Engineer NameVinay rajbhar
Structural Engineer AddressGauri Bazar Sarojini Ngar, Lucknow
Mobile number(Project Co-ordinator)8303223232