Launch Date
Completion Date
RERA ID
27.57876389
77.61964167
NA
The boundary wall will be constructed as per site condition
All the roads with required design thickness based on CBR value will be either flexible or rigid pavement
All main artery roads and sub-artery roads will have footpaths in the shoulders and these footpaths will be finished with the material which will allow rain water percolation into the soil below
The water demand is calculated as per the water supply manual of Ministry of Housing and Urban Development Govt. of India. The per capita consumption of water is considered as 135 lpcd and based on this demand and estimated population water requirement has been workout.
Sub-mains with provisions to link the disposal of each tower through chambers/manholes will be laid and these submains will be connected to the manholes of trunk mains laid in the service corridors of the arterial and sub-arterial roads.
Dual network, one for roof top rain connected to rain water harvesting pits provided at different locations as per the design, and the overflow of the rain water harvesting pits will be connected to the external drainage network. The external drainage network will be provided to carry the road and plot run-offs and finally disposed off into the natural storm drains.
All the parks as proposed in the layout will be developed with provision for tot lot areas, sport activities area, lawn jogging tracks and shrubs shady trees as per the design
Trees of different species will be planted on the periphery off the site and along roads. the species of trees will be almost of similar types which already exist in the surrounding areas of the township. Big leaf trees will also be provided on the periphery
The electrical network designed for the township is as per Indian Electricity Act and rules, guidelines and regulations of UP electricity supply code 2005 and guidelines, and regulations of Uttar Pradesh Electricity Regulatory Commission for electrical distribution networks in Private builders townships
NA
As explained above the sewerage and sullage water will be treated in STPs and PHYTORID technology STP is proposed in the township
Garbage bins and collection points have been proposed.
Rain water harvesting pit number and size based on the design at different locations will be provided and only the overflow of these pits will be drained into natural nalahs
LED Luminaires will be used and solar energy will be used for charging the energy accumulators and lighting of roads and parks will be done with these accumulators as source of energy.
Provisions has been made as per the National Building Code. Also fire hydrants will be provided on recycled water lines so that in the event of emergency water can be drawn from these hydrants by the fire department.
NA
NA
NA
Showing 3 blocks with 16 units
Total Carpet Area
28855.68 m²
310599.65 ft²
Total Units
912
2 different types
Blocks & Floors
3
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
52720.00 m²
567472.81 ft²