Launch Date
Completion Date
RERA ID
28.719835
77.434226
YES, WITH THEIR NUMBERS DISPLAYED ON SITE
RCC COLUMNS AND MASONARY WITH BRICKWORK UPTO 9 FEET IN HIGHT. (ALSO DECORATED MOULDING ON THE WALL ADJACENT TO GREEN AREA)
INTERNAL ROADS AND PATHS (WHICH WILL BE OF 7.5 AND 9 METRES WIDTH ) WHICH WILLL BE OF MADE INTERLOCKING TILES WITH KERB STONE ON SIDES
1.5 METRE WIDE FOOTPATHS MADE OF PAVERS/INTERLOCKING AS PER STANDARD SPECIFICATIONS
DOUBLE PUMP HYDRAULIC WATER SUPPLY LINE WILL BE PROVIDED (UNDERGROUND) FORM UNDERGROUND TANK OF 25+25 KL
UNDERGROUND SEWER SYSTEM WITH DOUBLE WALL CORRUGATED PIPES (SN-8 QUALITY) OR EQUIVALENT AND SAME CONNECTED TO AUTHORITY DISPOSAL LINE
UNDERGROUND DRAINAGE SYSTEM WITH SAUCER DRAINS FOR RAINWATER HARVESTING AND DOUBLE WALL CORRUGATED PIPES ( SN-8 QUALITY) OR EQUIVALENT ALONG WITH 2 RAINWATER HARVESTING PITS PROVIDED
BEAUTIFUL LANDSCAPE DONE AS PER ARCHITECURAL DRAWINGS WITH VARIOUS FACILITIES SUCH AS BADMINTON COURT, OPEN GYM, YOGA LAWN AND AN ENHANCED WALKING PATHWAY
AS PER SANCTIONED DRAWING -A PROPOSAL OF 50+ TREES WHICH CAN BE MODIFIED ACCORDING TO LANDSCAPING REQUIREMENTS AND SPACE
THE UNDERGROUND ELECTRIC SUPPLY PROVIDED WITH 50 PERCENT DIVERSITY FACTOR AND 20 ELECTIC POLES ALONG THE PATHWAY . ESTIMATED LOAD -401 KW
NA
THROUGH SEWAGE TREATMENT PLANT (STP) OF 40+ 40 KLD CAPACITY WHICH WILL BE USED FOR HORTICULTRUE AND EXCESS TO BE DISPOSED IN AUTHORITY SEWAGE LINE
ORGANIC WASTE CONVERTOR, COLLECTION BINS
2 AIN WATER HARVESTING PITS ( FOR DRAINAGE) AS PER NORMS
NA
NA
PROPER WATER SUPPLY AND SANITARY FACILITIES ALONG WITH LUSH LANDSCAPING FOR AIR PURIFICATION AND PARK CONSTRUCTION FOR PHYSICAL EXERCISE
NA
NA
Showing 1 blocks with 3 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
24712.00 m²
265997.50 ft²