OngoingActive

7th Avenue - Gaur City

Gautam Buddha Nagar, Uttar Pradesh
01-01-2016
Launch Date
Ongoing
Type
06-03-2023
Completion Date

Overview

Launch Date

01-01-2016

Completion Date

06-03-2023

RERA ID

UPRERAPRJ6695

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)35880
Project Name7th Avenue - Gaur City
Registration Fee (in Rs.)184500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)87
DistrictGautam Buddha Nagar
Original Start Date01-01-2016
TehsilDadri
Proposed Start Date01-01-2016
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)125200
Proposed Completion Date06-03-2023

Location

Latitude

28.60818944889625

Longitude

77.42667638763889

Bank Details

Account no.05860200001575
Name Of Account HolderGaursons Hi-Tech Infrastructure Private Limited
Bank NameBank of Baroda
Branch AddressGROUND FLOOR, BOB BUILDING
Branch NamePARLIAMENT NEW DELHI
IFSC CodeBARB0PARLIA

Development Works

Demarcation of Plots

Designated plots is demarcated as per the Lease plan issued by the authority

Boundary Wall

Boundary wall has already been constructed on site

Road Work

Internal roads designed of different R.O.W. as per requirement

Footpaths

Footpaths is provided as per the Layout plan

Water Supply Including Drinking Water Facilities

Municipal water supply is used for drinking purpose.

Sewer System

Sewerage system is used with STP as per the design calculation

Drain

Separate drainage line is used as per the design requirement

Parks

Landscape area is provided as per Local Building Bye-laws

Tree Planting

No. of trees as per the approved drawings & requirements.

Design For Electric Supply Including Street Lighting

Electric supply including street lighting is provided as per the Layout plan.

Community Buildings

Designed for community facilities as per the design requirement

Treatment and Disposal System of Sewage and Sullage water

Disposal system of Sewage and Sullage water is being used through STP which is used for Landscape and flushing purpose.

Solid Waste Management And Disposal System

All the solid waste managed as per the biogradible waste converted in to compost and non biogradible delivered to registered recyclable agencies.

Water Conservation System

Low flow water fixtures being used for water conservation and STP water is used for landscape and flushing purpose.

Energy Management System Including Use of Renewable Energy

Specific U-value glass is used for energy management and for roof insulation light colour tiles is used, and for renewable energy Solar photovoltic energy is used for common areas.

Fire Protection And Fire Safety System

Fire system and fire safety system is installed in the buildings as per the NBC norms.

Social Infrastructure And Other Public Amenities Including Public Health Services

Social infrastructure and other public amenities including public health services are provided as per local Building Bye-laws

Emergency Evacuation Services

As per Enviornment management plan and Disaster management plan all provisions are made including assembly point

Other Miscellaneous Work

Other Miscellaneous work is provided as per the Layout Plan

Documents

Lease Deed

No: 8016 | Date: 05-05-2010

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 10-08-2021

Commencement Certificate

Uploaded: 29-07-2018

Proforma of Application Form

Uploaded: 29-07-2018

Proforma of Allotment Letter

Uploaded: 29-07-2018

Proforma of Conveyance Deed

Uploaded: 29-07-2018

Waste Disposal Plan

Uploaded: 29-07-2018

Water Supply Plan

Uploaded: 29-07-2018

Electricity Supply Plan

Uploaded: 29-07-2018

Development Work Plan

Uploaded: 29-07-2018

Affidavit

Uploaded: 29-07-2018

CA CERTIFICATE

Uploaded: 20-11-2020

ARCHITECT CERTIFICATE

Uploaded: 20-11-2020

ENGINEERS CERTIFICATE

Uploaded: 20-11-2020

Registry Document In Case of Own Land

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Commencement Certificate

Uploaded: 31-07-2017

Proforma of Application Form

Uploaded: 31-07-2017

Proforma of Allotment Letter

Uploaded: 31-07-2017

Proforma of Conveyance Deed

Uploaded: 31-07-2017

Waste Disposal Plan

Uploaded: 31-07-2017

Water Supply Plan

Uploaded: 31-07-2017

Electricity Supply Plan

Uploaded: 31-07-2017

Development Work Plan

Uploaded: 31-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Floor plans of all types

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Affidavit

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 31-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Floor plans of all types

Uploaded: 31-07-2017

Floor plans of all types

Uploaded: 31-07-2017

Floor plans of all types

Uploaded: 31-07-2017

Floor plans of all types

Uploaded: 31-07-2017

Floor plans of all types

Uploaded: 31-07-2017

Floor plans of all types

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 28-11-2017

Other Plan(If Any)

Uploaded: 28-11-2017

Other Plan(If Any)

Uploaded: 15-12-2017

Other Plan(If Any)

Uploaded: 19-12-2017

Other Plan(If Any)

Uploaded: 04-01-2018

Other Plan(If Any)

Uploaded: 05-01-2018

Other Plan(If Any)

Uploaded: 05-01-2018

Other Plan(If Any)

Uploaded: 05-01-2018

Other Plan(If Any)

Uploaded: 22-01-2018

Other Plan(If Any)

Uploaded: 07-04-2018

Other Plan(If Any)

Uploaded: 12-04-2018

Permits

Orignal Permit NoPlg(BP)-3557/GH/6201
Orignal Permit Date09-10-2015
Valid Upto08-10-2020
Revalidated Permit NoPLG/BP 3557/5967
Revalidated Permit Date08-09-2017
Revalidated Permit Valid Upto07-09-2022
Permit Extendable Upto06-09-2027
End Date07-09-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)A-Square Tech Builder And Contractors
Contractor AddressB 1-2/8, Sector-2, Rajender Nagar, Ghaziabad
Architect NameHariom Shukla
Architect AddressGaur Biz Park, Plot No-1, Abhay Khand-II, Indirapuram, Ghaziabad (U.P)
Architect Licence NumberCA/2012/55413
Structural Engineer NameVakil Mehta Sheth
Structural Engineer Address83/84, Sakhar Bhawan, 230, Nariman Point, Mumbai-400021
Mobile number(Project Co-ordinator)01204343333

Land Details

AFS

Showing 12 blocks with 466 units

Property Summary

Total Carpet Area

172593.26 m²

1857776.59 ft²

Total Units

2995

4 different types

Blocks & Floors

12

34 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:57.63 m²
Balconies:704
Parking ratio:0.00 per unit

Block BLOCK-A

42 units

Block BLOCK-B

32 units

Block BLOCK-C

32 units

Block BLOCK-D

32 units

Block BLOCK-E

32 units

Block BLOCK-F

32 units

Block BLOCK-G

32 units

Block BLOCK-H

22 units

Block BLOCK-I

44 units

Block BLOCK-J

44 units

Block BLOCK-K

42 units

Block BLOCK-L

80 units

Khasra Details

Total Area

503216.00 m²

5416566.70 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-01
Area(In Sq. Mt.)503216

Other Details

Contractor Name (if any)A-Square Tech Builder And Contractors
Contractor AddressB 1-2/8, Sector-2, Rajender Nagar, Ghaziabad
Architect NameHariom Shukla
Architect AddressGaur Biz Park, Plot No-1, Abhay Khand-II, Indirapuram, Ghaziabad (U.P)
Architect Licence NumberCA/2012/55413
Structural Engineer NameVakil Mehta Sheth
Structural Engineer Address83/84, Sakhar Bhawan, 230, Nariman Point, Mumbai-400021
Mobile number(Project Co-ordinator)01204343333
7th Avenue - Gaur City by GAURSONS HI-TECH INFRASTRUCTURE PRIVATE LIMITED | ReraTracker