Launch Date
Completion Date
RERA ID
28.311956
77.557984
Designated plots is demarcated as per the lease plan issued by the authority.
Boundary wall is provided as per the sanctioned layout plan.
Internal Roads designed of different R.O.W as per requirement and also given in sanctioned site plan.
footpaths is provided as per the Design.
municipal water supply is used for drinking purpose and details of water supply plan is also uploaded.
sewerage system is used with STP as per the design calculation and waste disposal plan is also uploaded.
separate drainage line is used as per the design requirement.
landscape area is provided as per local Building Bye laws.
as per the Design.
Electric supply including street lighting is provided as per the layout plan and details of electricity supply plan also uploaded.
N.A, Since it is a Plotted Development Project
Disposal system of sewage and sullage water is being used for landscape and flushing purpose.
All the solid waste managed as per the biodegradible waste converted in to compost and non biodegradible delivered to registered recyclable agencies.
N.A, Since it is a Plotted Development Project.
N.A, Since it is a Plotted Development Project.
fire system and fire safety system is installed in the project as per the National Building Code norms.
N.A, Since it is a Plotted Development Project.
as per the Fire NOC.
other miscellaneous work is provided as per the layout plan including Roads, Green Area, Electrical works etc.
Showing 1 blocks with 5 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
42302.00 m²
455334.50 ft²