Launch Date
Completion Date
RERA ID
28.303616316995623
77.56284063564426
Designated plots is demarcated as per the Lease plan issued by the authority
Boundary wall has already been constructed on site
Internal roads designed of different R.O.W. as per requirement
Footpaths is provided as per the Layout plan
Municipal water supply is used for drinking purpose.
Sewerage system is used with STP as per the design calculation
Separate drainage line is used as per the design requirement
Landscape area is provided as per Local Building Bye-laws
No. of trees as per the approved drawings & requirements.
Electric supply including street lighting is provided as per the Layout plan.
Designed for community facilities as per the design requirement
Disposal system of Sewage and Sullage water is being used through STP which is used for Landscape and flushing purpose.
All the solid waste managed as per the biogradible waste converted in to compost and non biogradible delivered to registered recyclable agencies.
Low flow water fixtures being used for water conservation and STP water is used for landscape and flushing purpose.
Specific U-value glass is used for energy management and for roof insulation light colour tiles is used, and for renewable energy Solar photovoltic energy is used for common areas.
Fire system and fire safety system is installed in the buildings as per the NBC norms.
Social infrastructure and other public amenities including public health services are provided as per local Building Bye-laws
As per Enviornment management plan and Disaster management plan all provisions are made including assembly point
Other Miscellaneous work is provided as per the Layout Plan
Showing 38 blocks with 498 units
Total Carpet Area
208133.40 m²
2240327.10 ft²
Total Units
3106
4 different types
Blocks & Floors
38
26 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
404697.00 m²
4356118.04 ft²